Saturday, 2 September 2023

Sustainable Solution to the Food Waste Disposal at Workmen Camp | Chapter 4 | Research and Developments in Engineering Research Vol. 7

The object concerning this research is to discover sustainable resolution to the food waste disposal at workmen camp.In current age, food appliance for grinding garbage at workmen camp is one of the bigger problems being confronted via many countries with its own government the world over. In the workmen colony at Chittapur, kalaburagi locality, Karnataka State, India, a chain of kitchens were constructed for browning purpose and some of limited canteens were also worked. Big quantity of drink waste was collected regularly from these eateries and disposed at a faraway place. Food waste is well degradable in nature, except that disposed correctly it causes environmental pollution. Hence, it is very main to identify tenable environmental method to order food waste at laborer camp. An anaerobic digestion plan was adopted. And built an anaerobic digestion arrangement with a capacity of 500 kg per epoch at workmen camp. This establishment is the first show up the construction manufacturing at workmen camp in India. An Anaerobic Digestion has been acknowledged as one of high-quality options that are available for doctoring food waste, in the end it produce methane smoke   and compost accompanying nutrients. Biogas is a combination of CH4 and CO2 about (55:45). Micro-economical benefits by energy and manure substitutes and macro-financial benefits through decentralizing energy era and environmental protection is the main benefit of biogas plant using fare waste at the workmen camp. Biogas generated maybe used for thermal requests such as boiling or for generating power. The digested slurry is a well sustained organic fertilizer and can be used as soil manure. Plant was designed to handle 500 kg of cuisine waste /day. 27 kg LPG was produce from 500kg of kitchen waste and bearing organic fertilizer with plant micro and large-scale nutrients. This maybe used for increasing plants and in agriculture. The annual income has generated Rupees of 10.62 lakh and the annual payment was Rupees of 1.8 lakh. The net benefit of Rupees 8.82 lakh. Payback period is 2.1 years. This process controls the loud noises and fulfilled the idea of reduce, talk over again and energy improvement. This establishment is the first come into sight the construction manufacturing at workmen camp in India. It controls the environmental pollution and fulfilled the idea of Reduce, Reuse, and Energy Recovery.

Author(s) Details:

G. Reddy Babu,
Department of Civil Engineering, Seshadri Rao Gudlavalleru Engineering College, Gudlavalleru-521356, Andhra Pradesh, India.

G. Madhava Kumar,
Chief Manager-EHS, Siemens Large Drives India Pvt. Ltd., Hyderabad, India.

Please see the link here: https://stm.bookpi.org/RADER-V7/article/view/11704

No comments:

Post a Comment