This work aims to resolve and implement improvements in supplies integrated into result processes in pharmaceutical workshops for the production of alive pharmaceutical elements (API). In the project, studies were carried out utilizing the finite piece method (FEM) and usual structural design, to test the feasibility of the picked solutions. Then, the cost study was carried out, and the benefits and results of the new supplies were presented. It was attainable to conclude that the projected equipment illustrates advantages at an fitting, hygienic and efficient level compared to the original one, which interprets into an increase of the company’s competitiveness in the pharmaceutical advertise.
Author(s) Details:
A. C. P. Soares,
Departamento
de Engenharia Mecânica, Instituto Superior de Engenharia do Porto, Instituto
Politécnico do Porto, R. Dr. António Bernardino de Almeida, 431, 4200-072
Porto, Portugal.
R.
D. S. G. Campilho,
Departamento
de Engenharia Mecânica, Instituto Superior de Engenharia do Porto, Instituto
Politécnico do Porto, R. Dr. António Bernardino de Almeida, 431, 4200-072
Porto, Portugal and INEGI – Pólo FEUP, Rua Dr. Roberto Frias, 400, 4200-465
Porto, Portugal.
M.S. Kirgiz,
Departamento de Engenharia Mecânica, Faculdade de Engenharia da
Universidade do Porto, Rua Dr. Roberto Frias, s/n, 4200-465 Porto, Portugal.
M. V. Kumar,
Department of Civil Engineering, Vel Tech Rangarajan Dr. Sagunthala
R&D Institute of Science and Technology, Chennai, India.
R. Alzein,
Department
of Civil Engineering, Vel Tech Rangarajan Dr. Sagunthala R&D Institute of
Science and Technology, Chennai, India.
Please see the link here: https://stm.bookpi.org/RADER-V7/article/view/11702
No comments:
Post a Comment