Fast change current in customer’s demand determines the type of production. The "extreme-mix and reduced volume" production has enhance the mainstream of result to meet customer’s need. The main problem of high-join low capacity production is significantly growing the frequency of start, causing an increase in set-up occasion for production. For methodical reduction strategies, Shingo projected a lean manufacturing methods called Single Minute Exchange of Die (SMED). The SMED methodology form it possible to reduce arrangement (changeover) movements time significantly. In this study, a rope processing association is used as a study case. The potential of faster setup maybe completely realized with SMED method. Furthermore, an revamped scheduling citation indicator is presented for the cut carefully with sharp instrument machine that help resolution makers to determine the sequencing rule of organizing by each criterion through bureaucracy to improve the performance.
Author(s) Details:
Chuang-Chun Chiou,
Department of Industrial Engineering and Enterprise
Information, Tunghai University, No. 1727, Sec. 4, Taiwan Blvd., Xitun Dist.,
Taichung City-407, Taiwan.
Shih-Shun
Wang,
Department
of Industrial Engineering and Enterprise Information, Tunghai University, No.
1727, Sec. 4, Taiwan Blvd., Xitun Dist., Taichung City-407, Taiwan.
Huynh Trung Luong,
Industrial Systems Engineering, Asian Institute of Technology. P.O. Box 4,
58 Moo 9, Km. 42, Paholyothin Highway, Klong Luang, Pathum Thani 12120
Thailand.
Please see the link here: https://stm.bookpi.org/RPST-V8/article/view/10060
No comments:
Post a Comment