In this study the cohesion of Nigerian transmission scheme during possibility (sag) was determined and appropriate placement of Static Synchronous Compensator (STATCOM) in method load buses where sag strength occur was accomplished as to defeat the Power Quality (PQ) problems emerging from habit of non-linear loads from the users which have negative impacts on the movement of the power arrangement. Thus, this research analyzed the PQ question on Nigerian 330 kV, 28-bus system. The Newton-Raphson (NR) repetitive approach was utilized to act load flow analysis on Nigerian 28-transport transmission methods. The STATCOM power dose model was then used to modify the NR numerical model. The optimal installation of the STATCOM in the system was raise using the Voltage Sensitivity Index (VSI), and imitation was performed in MATLAB/SIMULINK. According to the findings, highest in rank locations for the STATCOM boss in the power whole were buses 5, 8, 12, and 16. The corresponding STATCOM sensitive power, sag power and sag duration for buses 5, 8, 12 and 16 were 72.56 MVar, 0.77454 p.u, 0.7336s; 65.35 Mvar, 0.7464 p.u, 0.7419 s; 50.86 Mvar, 0.7615 p.u, 0.6512 s and 53.75 MVar, 0.7442 p.u. 0.5972 s, respectively. As a result, the verdicts have demonstrated the meaning of STATCOM with VSI in judgment appropriate solutions for PQ issues in energetic power systems.
Author(s) Details:
Balogun Abass,
National
Centre for Hydropower Research and Development, University of Ilorin, P.M.B.
1515, Nigeria.
Please see the link here: https://stm.bookpi.org/TAER-V1/article/view/12556
No comments:
Post a Comment